Monthly plans start with 30 days free — up to 50 sheets, card required, cancel anytime. Start your free month →

How Plumb works

Systematic Drawing Review

Upload a PDF drawing package. Plumb reviews every sheet across 14 categories of common design, documentation, fabrication, and engineering-related issues, then returns the findings in files your team already knows how to use.

Back within 24 hours · Marked-up PDF + Excel findings log

From Drawing Package to Reviewed Package

Use the arrows or tap a step to walk through the process. Steps 3 and 4 are real pages from a review we ran — the same files you can download in full.

Plumb · Step 01 of 04

Architectural-Louvers_Rev1.pdf

Sheets

7

Format

PDF

Sheet count read straight from the file

Project

Architectural Louvers

Review

Tier 1 — Buildability Review

This is a preview of the upload step. Start a real review from the Pricing page.

Submit the PDF your team already works with. Name the project, select the review you need, and upload the package. Plumb reads the sheet count directly from the file.

1/4

What Plumb Creates

Marked-Up PDF

Your original drawing package with findings clearly identified where they occur.

  • Numbered findings on the drawings
  • Severity-coded comments
  • Sheet-specific references
  • PE-Review-Required items clearly identified
  • Summary and finding details included with the package

Excel Findings Log

Every finding organized into a file your team can sort, filter, assign, and track.

  • One finding per row
  • Sheet reference
  • Severity
  • Finding description
  • Recommended action
  • Sortable and filterable output

Both files contain the same findings, presented for different purposes — the PDF shows each issue in context on the drawing; the Excel log lets your team organize and track it. The online viewer shows the same findings sheet by sheet, and lets you flag or remove one.

See a Complete Sample Review →

Plumb adds another pass to your QA process.

Plumb is not a replacement for your designers, detailers, checkers, or engineers. It gives your team another systematic review of the complete package before release.

Coverage

Your existing review

Depends on reviewer, workload, and available time

With Plumb added

Every sheet receives the applicable systematic review checks

First-Pass Checks

Your existing review

Reviewed manually by your team

With Plumb added

Plumb flags missing, conflicting, incomplete, or unclear information

Findings

Your existing review

Redlines, comments, or internal notes

With Plumb added

Findings organized by sheet and severity

Timing

Your existing review

Competes with active project workload

With Plumb added

Additional review pass completed before release

Professional Judgment

Your existing review

Your professionals make the decisions

With Plumb added

Your professionals still make the decisions

Your team stays in control. Plumb gives them another set of findings to work from.

Plumb Does Not Replace Your QA Process. It Makes Your QA Process Harder to Beat.

Choose the Review Your Drawing Package Needs

Not every package needs the same level of review. Plumb offers three review tiers based on where the drawings are in the process and what your team needs checked.

Tier 1

Buildability Review

Systematic review for common drawing, documentation, coordination, and fabrication issues.

Best for
Routine drawing review before release to fabrication.

Tier 2

Submittal Readiness Review

Includes Tier 1 plus engineering readiness and submittal completeness against the applicable jurisdictional profile.

Best for
Packages moving toward engineering review or formal submittal.

Plumb does not determine or certify code compliance.

Tier 3

Specification Correspondence Review

Includes Tier 1 plus systematic comparison against the project specification you supply.

Best for
Specification-driven projects where the drawing package needs to be checked against project requirements.

A documentation check against the specification you supply — not a determination of contract compliance.

Compare Review Tiers and Pricing →
What Plumb checks

14 Review Categories on Every Sheet.

The review is built around the kinds of issues experienced reviewers look for with a red pen, applied systematically across the complete drawing package.

Dimensions

Are parts fully dimensioned? Do dimension chains close? Are required tolerances provided?

Welds & Joints

Are weld size, type, length, finish, and joint requirements clearly defined?

Materials & Finishes

Are material grade, thickness, alloy, coatings, colors, and finish requirements complete and consistent?

Cross-Sheet Consistency

Do general notes, details, schedules, plans, and elevations agree with one another?

Connections

Are bolt types, grades, hole patterns, edge distances, fasteners, and connection requirements clearly documented?

Fabrication & Assembly

Are subassemblies, fabrication relationships, bill of materials, and sequence requirements clear enough to build from?

Shipping & Field Installation

Are splice locations, handling requirements, installation conditions, anchors, and field interfaces coordinated?

Scope & Professional Review

Are by-others items and scope boundaries clear? Are conditions requiring engineering judgment identified for licensed professional review?

Plumb also checks document control, drawing clarity, referenced standards, bill of materials information, fabrication sequence, and other trade-specific criteria.

Plumb Flags. Your Professionals Decide.

Plumb reviews drawing and documentation packages for conditions that deserve attention.

It does not stamp drawings, make engineering decisions, certify structural adequacy, or determine code compliance.

When a potential issue can be identified from the documents, Plumb flags it. When resolving that issue requires engineering judgment, the finding is marked [PE] PE-Review-Required for review by the appropriate licensed professional.

That boundary is intentional.

Build with confidence.

Use Plumb on Your Next Drawing Package.

Start with a single package and see what another systematic review pass finds before your drawings reach production. No subscription required.

Frequently Asked Questions About Plumb Reviews

01How long does a Plumb review take?+
Back within 24 hours. Very large or complex packages can take longer.
02What file do I need to submit?+
A PDF drawing package. Plumb works from the files your team already produces. Source CAD files are not required.
03Does Plumb replace our checker?+
No. Plumb adds another systematic review pass before release. Your team remains responsible for reviewing the findings and making project decisions.
04Does Plumb provide engineering?+
No. Plumb identifies potential drawing and documentation issues. Conditions that require engineering judgment are flagged for review by the appropriate licensed professional.
05What trades does Plumb support?+
Plumb supports a growing range of fabrication disciplines, including structural steel, architectural and ornamental metals, millwork, composites, themed entertainment, scenic fabrication, and mixed-trade packages.
Plumb Review

The documentation review layer for design. Build with confidence.

Plumb provides a systematic documentation review. It is not engineering, not a code-compliance determination, and not a substitute for review by a licensed Professional Engineer, Engineer of Record, or Authority Having Jurisdiction. Findings marked PE-Review-Required must be reviewed by a licensed design professional before any corrective action. Submittal readiness review checks documentation completeness and consistency only; it does not determine or certify code compliance and is not a substitute for the Authority Having Jurisdiction or your Engineer or Architect of Record.

Product

Company

hello@plumbreview.com
© 2026 Plumb · Shop Drawing ReviewBKM Ventures LLC